Sateco, a new generation concrete formwork

By Batipole Edition   Published on Thursday, May 26, 2011 at 02:00 AM
Sateco, a new generation concrete formwork

Summary for decision-makers

The collaboration between SATECO and Costantini led to the development of the SC 1015 Box, an innovative formwork that meets the demands of modern construction sites. Used on the administrative building site in Belval, this new technology can withstand pressures of up to 15 tonnes/m² and is distinguished by its isothermal double wall. It allows for fast and efficient pouring, even in difficult weather conditions, meeting the builders' productivity ambitions. The SC 1015 Box, equipped with an anti-corrosion structure and integrated accessories, ensures easy transport and immediate installation, thus helping to reduce lead times on construction sites.

This tool, designed to improve operator ergonomics and safety, is now a major asset for Costantini, one of Luxembourg's leading construction companies. Thanks to its lightness and compactness, the SC 1015 Box is easy to handle without the need for disassembly, thus promoting rapid adoption by teams. By offering a more efficient solution that complies with environmental standards, SATECO guarantees decision-makers a significant improvement in productivity and comfort on site.


Sateco's SC 1015 Box formwork has won over Costantini, one of Luxembourg's leading construction companies, to manage the construction site of the new administrative building in Belval, Luxembourg. This new formwork material has excellent isothermal properties and is also very easy to assemble and disassemble. It allows for high-quality concrete shaping and ensures safety on construction sites.

The SC 1015 BOX: a revolution in formwork thanks to the SATECO-Costantini collaboration

Feedback from Costantini on the use of first-generation formwork allowed SATECO to improve the SC 1015 Box and offer optimized equipment that is more ergonomic and more resistant to concrete pressure (up to 15 tons/m² in the box). Used on the Belval construction site in Luxembourg, where the facades are load-bearing, the SC 1015 BOX perfectly met the builder's requirements. Its double wall gives it isothermal characteristics, allowing pouring even in difficult climatic conditions. Finally, its box with a space-saving anti-corrosion structure and its fully integrated accessories guarantee rapid implementation, easy maintenance and optimized transport. 

« Our goal is to complete a level in seven days and the concreting rates must be at a sustained pace, which is now possible thanks to the Sateco Box. ", says Mr. Christophe Dardenne, Director of the Equipment Division of the Costantini company. The main construction site is expected to be completed in July 2012.

FIRST ADMINISTRATIVE BUILDING OF THE BELVAL MASTERPLAN

The new administrative building is part of the master plan for the redevelopment of the Belval site, which brings together five districts to provide a high-profile architectural environment for various urban functions of housing, work and leisure (the University of Luxembourg, the City of Science, Culture and Innovation, a concert hall, financial companies, etc.). The construction will be composed of two parts: a wider base to house the laboratories of the Water Management Administration and the Environment Administration, on which rests a 60-meter-high tower reserved for offices.
Belval, the Grand Duchy's new tertiary site, offers 120 hectares of real estate opportunities. The first project to integrate all aspects of sustainable development, the site will have the capacity to accommodate 7 residents and nearly 000 employees. It also incorporates the most cutting-edge technology to ensure a high quality of life. 

ERGONOMICS, SAFETY AND EASE OF IMPLEMENTATION FOR UNPARALLELED SPEED

Luxembourg-based Costantini has been working with Sateco for nearly six years and has contributed to the development of the new SC 6 Box formwork, which the formwork specialist has just deployed for the Belval administrative building project. Founded nearly 1015 years ago, Costantini is one of Luxembourg's leading construction companies, dedicated to ensuring the best working conditions for optimal speed and safety on its construction sites. A loyal partner of Sateco, Costantini is the first to place its trust in this new equipment, with a total of 30 SC 24 Box formworks used on this project. 


« The new Box is highly ergonomic and easy to use for our operators. We are therefore confident in their safety on this high-rise building. ", assures Mr. Boris Hoerner, Head of the Costantini Department. Sateco addressed our concerns about pouring times and designed the formwork in a "honeycomb" style, which gives it isothermal qualities. We can now remove the formwork the next day without any risk of snagging. » 


With this system, the material becomes 6 times more insulating than conventional formwork. In terms of safety, the SC 1015 BOX can be moved with ease, as it does not require disassembly.On site, our operators took ownership of the SATECO Box after a brief demonstration and thanks to the fully integrated accessories. They folded and unfolded the ready-to-install formwork in record time. » Lighter, the SC 1015 BOX are easier to handle while remaining reliable and robust. Now more compact, when folded they can be stacked on 6 levels, a considerable space saving for their transport. Finally, the new generation SC 1015 Box formworks are treated with an anti-rust coating on the inside and are compatible with the entire SATECO formwork range. 

New from SATECO, the SC 1015 Box is a true revolution in the construction industry. This new technology from Sateco guarantees:
Easy maintenance thanks to a closed and flat box with an innovative design:
- Undeniable isothermal performance
- Easy maintenance with a closed, anti-corrosion structure
- Integrated traceability
- A finish that complies with environmental standards
Ergonomics at all levels:
- Easy access (foot jacks, spacer rods, assemblies in 
juxtaposition…)
- A crutch with integrated captive lock
- Optimum security in access and use
Increased productivity with guaranteed robustness:
- 15t of resistance for only 16 cm of thickness
- Reduced footprint for use in corridors
- Captive pins for all accessories 
- Universal spacer blocks with integrated formwork face plug 
 











ZONE INDUSTRIELLE - BP 10
86110 MIREBEAU
France


Tél. : 05 49 50 41 69
Courriel : info@sateco.fr