Building or renovating: five key decisions to make before getting a quote
Summary for decision-makers
New construction is subject to a 20% VAT rate , while renovations are subject to a 10% rate for improvements and a 5,5% rate for energy efficiency upgrades, provided the property has been completed for more than two years. Three situations trigger the standard VAT rate, including an increase in floor area exceeding 10%. New construction falls under the RE2020 regulations, while existing properties are subject to regulations based on individual elements, with the comprehensive version only applying when three cumulative thresholds are exceeded. An architect is required for properties 150 m² or larger, and structural damage insurance is mandatory before construction begins.
The choice between new construction and existing buildings is rarely based on price per square meter. It is based on distinct tax regimes, thermal regulations, mandatory use of a designer, and insurance, which are evident from the initial consultation and cannot be rectified once construction begins.
The tax separates the two paths right from the quote stage.
New construction is subject to the standard 20% VAT rate . Renovations are eligible for two reduced rates, provided the property has been completed for more than two years and is used for residential purposes. Improvement, conversion, development, and maintenance work is subject to a 10% VAT rate . Energy efficiency improvements—thermal insulation, renewable energy heating equipment, ventilation control, and hot water production—are subject to the 5,5% VAT rate stipulated in Article 278-0 bis A of the French General Tax Code, the technical specifications of which are detailed in Articles 30-0 D and 30-0 E of its Appendix IV.
The difference is half between the two extremes. It cannot be made up after invoicing, and it conditions the comparison between an extension and a renovation of equivalent surface area.
Three conditions cause a construction project to switch to the normal rate
The two-year rule doesn't cover everything. The standard rate applies in three situations that a building owner encounters more often than they might think: when the building was completed less than five years ago ; when the work increases the floor area by more than 10% ; and when the project, due to its scale, is akin to the construction of a new building.
A generous extension on a recent house thus combines two reasons for switching, which shifts the arbitration towards the rehabilitation of the existing volume — the conversion of the attic responds precisely to this calculation, since it creates living space without creating a footprint.
The procedure has changed. The paper form is no longer required: the client now certifies on the quote or invoice that the conditions for the reduced rate are met, and keeps their copy until December 31st of the fifth year following the completion of the work. Any missing or incomplete information exposes both the company and the client to tax reassessment.
Two thermal regulations, two different approaches.
New buildings fall under the RE2020 regulation , which takes a life-cycle approach and imposes a carbon indicator in addition to energy requirements. Existing buildings are subject to a completely different, and much less well-known, system, which is twofold.
The standard thermal regulations, applied element by element, constitute the general legal framework: each component replaced or installed must meet a minimum performance standard, regardless of the project's scope. The more stringent overall thermal regulations apply only if three conditions are met simultaneously : a net floor area exceeding 1,000 m² , a completion date after January 1, 1948 , and a cost of works exceeding 25% of the building's value excluding land. The corresponding requirements are set out in the decree of June 13, 2008 , while the standard costs used to assess the building's value are established by the decree of December 20, 2007.
The consequence is clear. The same renovation program, carried out in two phases rather than one, can remain below the 25% threshold and escape the overall regulations. This is a strategic decision regarding project management, not a trick: it is made before the application is submitted, and it commits the overall performance of the housing for decades.
| Element | New construction | Renovation of a dwelling that is more than two years old |
|---|---|---|
| Tax rate | 20% | 10% improvement, 5,5% energy efficiency |
| Thermal regulations | RE2020, energy and carbon requirements | Element by element, or globally beyond three cumulative thresholds |
| Hiring an architect | Beyond 150 m² of floor area | Beyond 150 m² after renovations, including existing structures |
| Building damage insurance | Before the start of construction | Before the start of construction, as soon as there is work |
The 150 square meter threshold is not only found in new construction.
The use of an architect is mandatory for floor areas exceeding 150 m² , a threshold lowered by decree no. 2016-1738 of December 14, 2016 for applications submitted since March 1 , 2017. Two clarifications govern its application in renovation.
First, the threshold is calculated based on the total surface area after the work , including the existing structure. A 30 m² extension on a 130 m² house would trigger the threshold, whereas the same extension, if built separately, would not. Second, the exemption only applies to individuals building for their own use: a real estate company, however modest its project, is still subject to the requirement. Moreover, the issue goes beyond mere formalities, and project management assistance is often warranted from the initial planning stages, even before the designer is selected.
Insurance cannot be purchased after the fact
The ten-year warranty under Article 1792 of the French Civil Code covers, for ten years, damage that compromises the structural integrity of the building or renders it unfit for its intended purpose. This warranty is the responsibility of the builder and applies to both renovations and new construction, provided the work constitutes a structure.
In contrast, structural damage insurance is taken out by the project owner before construction begins . It pre-finances repairs without waiting for liability to be determined, and its absence is costly twice: firstly, through the delay in compensation in the event of a claim, and secondly, through a reduction in the property's resale value within ten years. Checking the certificates of each contractor, ensuring they are up-to-date and cover the work performed, requires the same level of vigilance as choosing a ten-year structural warranty for the contractor.
None of these five points can be made up for during construction. They are decided when the program is finalized, that is, well before the first consultation with companies, and they explain that a properly planned renovation operation sometimes costs less than a new construction with equivalent performance — a difference that the revision of the DPE calculation has further accentuated.
Frequently asked questions about the trade-off between construction and renovation
Does the 5,5% VAT rate apply to all renovation work?
No. It is reserved for energy efficiency improvement works referred to in Article 278-0 bis A of the General Tax Code, the technical requirements of which are set out in Articles 30-0 D and 30-0 E of Annex IV. Other improvement, conversion, development and maintenance works are subject to the 10% rate.
Do I still need to fill out a VAT certificate?
No. The paper form has been eliminated and replaced by a certification that the client writes directly on the quote or invoice, attesting that the conditions for the reduced rate are met. They must keep their copy until December 31st of the fifth year following the completion of the work.
At what point does an extension cause you to lose the reduced rate?
When it increases the floor area by more than 10%, the standard rate also applies if the building was completed less than five years ago, or if the project is similar in scale to the construction of a new building. An extension to a recently built house often falls under both of these categories.
When does the overall thermal regulation apply to renovations?
Only if three conditions are met simultaneously: a net floor area exceeding 1,000 m², a completion date after January 1, 1948 , and a cost of works exceeding 25% of the building's value excluding land. Otherwise, the element-by-element regulations apply.
Does the 150 m² threshold also apply to renovations?
Yes, as soon as an extension is planned: the threshold is assessed based on the total floor area after the work is completed, including the existing structure. A 30 m² extension on a 130 m² house therefore exceeds the threshold. Furthermore, the exemption only applies to individuals building for their own use.
Can structural damage insurance be taken out during the construction phase?
It must be taken out before the start of construction. If taken out afterward, it is no longer valid. Its absence delays compensation in the event of a claim, since it is then necessary to establish the responsibilities of each party involved, and it affects the resale value of the property for the following ten years.
Glossary of construction and renovation
Floor area
The sum of enclosed and covered areas with a ceiling height exceeding 1,80 meters, measured to the interior face of the walls. It serves as a reference for planning permissions and the threshold for requiring an architect.
RE2020
Environmental regulations applicable to new constructions. They add to energy requirements a carbon impact indicator calculated over the life cycle of the building, from materials to deconstruction.
Thermal regulations element by element
The general legal framework applies to existing buildings. Each component replaced or installed must meet a minimum performance standard, regardless of the scale of the project.
Global thermal regulations
A reinforced regime applies to major renovations that meet three cumulative conditions of surface area, age, and cost. It considers the entire building, not just the replaced component.
Ten-year guarantee
The builder's strict liability, as provided for in Article 1792 of the Civil Code, covers for ten years damages which compromise the solidity of the structure or render it unfit for its intended purpose.
Building damage insurance
Insurance taken out by the project owner before the start of construction. It pre-finances repairs covered by the ten-year warranty without waiting for liability to be determined.